Sacramento Air & Vacuum System Upgrade

Sacramento, CA

A critical infrastructure upgrade was completed within an active healthcare facility to modernize medical air and vacuum systems that support patient care operations. The project required careful sequencing and coordination to maintain continuous service throughout construction, ensuring no disruption to ongoing clinical functions.

ESA South delivered a phased system replacement approach, including installation of new medical air and vacuum systems while maintaining temporary, fully operational backup systems. This allowed for seamless transition and continuous performance during demolition and integration of permanent infrastructure. Work also included system separation and reconfiguration to meet current standards, along with full testing and commissioning to verify reliability. The result is a modernized, high-performance system designed to support safe, uninterrupted facility operations and long-term reliability.