A campus-wide fire protection upgrade was completed within at the Waco VA Medical Center to improve safety and system reliability across multiple facilities. The project involved upgrades to fire suppression systems in several priority buildings, requiring coordinated work within occupied spaces while maintaining uninterrupted operations.
ESA South delivered system improvements including upgrades to sprinkler infrastructure and associated components, along with targeted building modifications to support integration with existing conditions. Work was carefully phased and executed to maintain safety, access, and functionality throughout the process. The result is an enhanced fire protection system designed to support long-term performance and reinforce life safety across the campus.