A mechanical systems upgrade is currently underway within the Malcolm Randall VA Medical Center active healthcare facility to improve air handling performance and overall building reliability. The project involves replacement of critical rooftop air handling units, requiring detailed coordination, early procurement, and precise execution to maintain environmental control and minimize disruption to ongoing operations.
ESA South is managing the removal and installation of new HVAC equipment, including a complex crane lift operation to position units within a constrained site. Interior work includes targeted demolition and upgrades to accommodate new mechanical distribution systems and ensure integration with existing infrastructure. This ongoing effort reflects the ability to execute high-impact system upgrades in active healthcare environments while maintaining control, safety, and operational continuity.